In September 1999, a Strategic Plan for Wind Power
was signed with Spanish investors by the Province of Río
Negro. For this plan, INVAP
was appointed as the Technological Agent for the province.
As such, INVAP must assess the wind
resource and identify possible new locations for wind farms. INVAP
will also participate in the construction of high power (over
600 kW) generators, and is to be responsible
for the assembly, start-up and maintenance of all the wind farms
to be installed in the Province of Río Negro.
The Strategic Plan for Wind Power for Patagonia contemplates
the installation of wind farms in the area reaching an installed
power of 300 MW, over the coming ten years. Participants
to this plan are the provinces of Chubut, Neuquén and Río
Negro along with the Spanish firms Endesa and Elecnor which joined
to create the company Enarsa for this endeavor.
In Río Negro, efforts to study the wind resource have
progressed most in San Carlos de Bariloche. There
are plans for a first stage of some eight wind driven generators
with an installed power of 5 MW in San Carlos de Bariloche, with
the view to reaching 15 MW at the conclusion
of a second stage.
Other possible wind farm sites in the Province of Río
Negro are in Viedma, San Antonio, General Conesa, General Roca,
Sierra Grande, Pilcaniyeu, El Bolsón, Choele Choel, El
Cuy and the region of the reservoir Embalse E. Ramos Mejía.
Locations selected in the Province of Neuquén are, Cutral
Co - Plaza Huincul, Zapala, Piedra del Aguila, and Chos Malal
among others.
The possible locations in the Province of Chubut are, Puerto
Madryn, Pampa del Castillo, Salamanca, Sierra Rosada, Trevelín
and Sarmiento among others.
|