In the technical field, this innovative design was finally consolidated,
for which a substantial amount of technical documentation was
issued and experimental devices and installations of diverse complexity
were built and operated.
The most relevant installations built are the Critical Facility
for neutron calculation verification (RA-8, Zero Power
Nuclear Reactor) and the Thermal-Hydraulic Test Laboratory,
which has the only testing circuit for High Pressure and Temperature
conditions designed and built in Argentina, where the conditions
of the reactor primary circuit are simulated and analysed.
USD 30 million were invested in the project throughout the last
15 years. If we compare it with other equivalent developments
in the international field, the relation between the design maturity
achieved and the investment made is highly favourable to the CAREM
project.
As reference, there is the SMART (KAERI, Korea) project,
for which investment exceeds USD 60 million and no solid conceptual
design has been achieved. On the other hand, the DoE (US
Department of Energy) has invested USD 19 million in
1999 and assigned USD 25 million for 2000 for its advanced reactors
program (NERI), aimed at the search of state-of-the-art
design solutions at conceptual level.
|